Category: Projects

  • Daylighting Tibbetts en Plein Air

    I recently finished this video overview for my City Artist Corps project from last fall. Take a look below, and you can read the text from the project here

  • 15. 238th Bridge over the Major Deegan

    15. 238th Bridge over the Major Deegan

    Just a day before embarking on this project, the IDA floods transformed this highway section into a watery expanse, stranding over 80 vehicles in the aftermath. Drawn back to the 238th Street Bridge, I set out to paint from the very spot where I had captured a poignant image on that tumultuous day.   At…

  • 14. The 233rd St Bridge

    14. The 233rd St Bridge

    10/28 
I painted on the 233rd street bridge. This is a short hop down from the 234th street bridge. I almost painted facing south to get a view of Albany Crescent, but looking toward the sun for the session didn’t seem like a good idea. I set up looking north over the highway with the…

  • 13. The Broadway Drain

    13. The Broadway Drain

    I painted the culvert where Hester and Piero’s Mill Pond descends underground into the broadway sewer, spilling approximately 5 million gallons of fresh water a day over the waterfall into the darkness. Earlier this summer, the poignant struggles of ducklings, Canada geese, and a swan cygnet caught in the challenging waters below the falls left…

  • 12. Riverdale Crossing Mall parking lot

    12. Riverdale Crossing Mall parking lot

    I painted in the BJ’s warehouse parking lot, the former site of the Stella D’oro cookie factory. This was another spot I knew of with no fence blocking the view. It’s under a sign for the larger complex, RIVERDALE CROSSING. These type of name choices are funny, solely meant to capitalize on the nearby affluent…